Since 2013, GZZC has designed crossing technical scheme and provided crossing equipment and installation services for Sudan railway.
1. National railway line:
In January 2013, it supplied level crossing equipment for cycas, which was installed on the 70 km Cycas line from Khartoum, the capital, to the refinery;
In December 2015, the level crossing equipment was supplied and installed in Port Sudan and Atbara.
2. Light rail line:
From 2015 to 2018, supply level crossing equipment for light rail lines in Khartoum, the capital of Sudan.